Bounce and slide around the facility should be set to prevent the collision the effective buffer matter and Landang of material.
Inflatable facilities
Inflatable facilities inflatable effect should be able to meet the passengers bouncing and safety requirements.
(The following 4.1.93-4.1.104 applicable slide project)
End brake
The Chute station should be set the reliable brake, brake length should not be less than 8m.
Slide on both sides of the obstacle distanceindoor amusement
The downward slide both sides of the obstacle distance should meet the 6.7 requirements of GB / T 18878-2002.
Slide the top Height
The downstream chute from the tunnel under the bridge b y the lower limit of the vertical height of the tackles panel surface parking on the premises from the bridge or tunnel should be ≥ 1.5m; the downstream chute and the top of the ropeway, taxiways, enhance tract or other facilities cross when there should be set above the taxiway safe and effective preventive isolation facilities. To prevent the lower limit of the isolation facilities to park there tackle the vertical distance of the panel surface shall not be less than 1.5m round waterbed